|
Radiology
Equipment Planning Services Provided by Architecture for
Radiology:
Below is
a standard suite of Radiology Equipment Planning Services that
can be provided by our firm. The list can be expanded or
reduced, depending on client/project requirements.
Equipment Program
Development
Equipment Planning, Inc. recommends that at the outset of each
project, that we sit down with the client and identify project
goals, including clinical priorities, budget, schedule and
phasing (if any). Equipment planning services offered in this
phase include:
-
Initial
Strategy and Program Meeting
-
Develop Equipment Master Plan. Addressing Clinical
Priorities, Budget, Schedule and Phasing
-
Technology
Assessment
-
Develop
Overall Equipment Plan
Assess Existing
Equipment
A common
requirement in the development of an Equipment Plan is to
evaluate the current equipment. Equipment Planning, Inc.
audits existing equipment systems, to evaluate what should be
kept in service (and for how long) vs. what should be
replaced. Existing equipment assessment services include the
following:
-
Identify Master List of
Existing Equipment
-
On Site Evaluation of Each
Equipment Item
-
Evaluate
Condition/Functionality of Equipment
-
Make Recommendation for
Maintain or Replace Existing Equipment
Development of
Equipment Plan
During this phase Equipment
Planning, Inc. develops a detailed room-by-room list of
required equipment, distinguishing between new and existing
equipment. Alternate specifications are developed in
conjunction with the client, to obtain competitive bidding on
all equipment where possible. We then create a preliminary
budget based on these needs. We also understand the new and
evolving interconnectivity issues in the healthcare
environment, including PACS, HIS, RIS, billing and other
Clinical Information Systems. New equipment planning services
offered include:
-
Meetings with Client to Develop
New Equipment Needs
-
Develop Preliminary Budget
-
Develop Alternate
Specifications to Obtain Competitive Bidding on Equipment
-
Make Recommendation for New
Equipment Specifications
-
Obtain Utility Requirements for
All Existing and New Equipment
-
Provide Cut Sheets and
Technical Data to Engineers
Purchasing and
Procurement Assistance
The goals of Equipment Planning,
Inc., during this phase of the work, are to obtain competitive
bidding on all new equipment, and to make sure that the
equipment purchase orders guarantee a match between client
needs and the equipment being provided. The most costly part
of the equipment planning process is often the purchase of the
equipment itself. Equipment purchasing and procurement
services include:
-
Create Equipment Requests for
Proposal (RFPs) to Obtain Competitive and Accurate Pricing
on New or Used Equipment
-
Manage Equipment Bid Process
-
Receive and Analyze Equipment
Bids
-
Prepare Equipment Bid Analysis
and Recommendations to Client on Equipment Purchase
-
Draft Equipment Planning
Purchase Requisitions
-
Manage Contracts and Purchase
Orders with Equipment Vendors
Services During
Construction
Equipment
Planning, Inc. provides required services during construction,
as they relate to the equipment procurement, delivery and
installation. Equipment planning services offered for the
construction phase include:
-
Monitor Equipment Vendor Lead
Times and Critical Path
-
Coordinate Delivery and Final
Delivery Schedule of Equipment
-
Work with Client Purchasing
department
-
Monitor the Budget
-
Develop a Receiving Strategy
-
Manage Move In Process
-
Job-Site Reviews of the Medical
Equipment Pre-Installation Requirements
-
Attendance Of All OAC Meetings
-
Coordinate
Vendor/Sub-Contractor Informational Exchange Meetings
-
Attend All Relevant Client
Leadership Meetings
-
Coordination Of Medical
Equipment Manufacturers' Installation Time-Lines
-
Process for Communicating
Changes to the Design and Build Teams
-
Process for RFI Communication
-
Coordination of Receiving and
Installation of All Medical Equipment
-
Coordination of All Clinical
Training
-
Coordination of Asset Tagging
and Bio-Medical Inspections
-
Coordinate Delivery Schedule
-
Coordinate Vendor
Demonstrations and Mock Up
-
Coordinate Installation
-
Coordinate Training
-
Change Order
Risk Management
Services Post
Construction
Post Construction Equipment
Planning Services Include:
-
Identify Critical Path for all
Vendor Installations
-
Identify Critical Path for
Clinical Training
-
Prepare Any Damage and Warranty
Reports
-
Consultations with Contractors and Movers
-
Implement
Staff Equipment Training Modules
-
Plan for
Incremental Installation to Keep The Facility Running
Without Significant Disruptions
Project Close Out
Once the
project is complete Equipment Planning, Inc. will meet with
all relevant staff and vendors to close out the project. We
will do a walk through and create a punch list and plan of
action. Equipment planning close out services include:
-
Room by Room
Inventory Report
-
Warranty
Documentation
-
CD of all
Collected Data
-
Training
Schedule
|