Radiology Master Plans
and Completed Radiology Departments
Radiology
Master Plans and Completed Radiology Departments
|
|
|
MP-1: Radiology Department Master Plan, Additions & Renovations -Robert
Wood Johnson University Hospital, Hamilton, NJ
 |
Master
Plan, Addition, and Renovations for 32,000 sf Radiology Department,
including: |
 |
Design
of phased construction plan to allow continued operation of radiology
department |
 |
Design
of patient/staff/material flow
|
 |
Design
of new inpatient and outpatient radiology procedure for the following
modalities : MRI Rooms,, CT Rooms, PetCT Rooms, Nuclear Medicine
Rooms, Angiography/Special Procedures Rooms, X-Ray Rooms,
Radiofluoroscopy (R/F) Rooms, Mammography Rooms, Ultrasound Rooms, and
Bone Densitometry Rooms |
 |
Design
of new PACs reading rooms, reception, waiting room, dressing rooms,
darkrooms, lightrooms, processing areas, hot labs, hot toilets,
regular toilets, clean utility rooms, and soiled utility rooms
|
 |
Project
Budgeting |
 |
Project
Scheduling |
 |
Architectural, Mechanical/Electrical Engineering, Structural
Engineering |
 |
Coordination of acoustic and vibration analysis
|
 |
Coordination of radiation and magnetic shielding
|
 |
Coordination of radiology equipment rigging, including path of entry
and egress of equipment, and required, associated architectural and
structural work |
 |
Coordination with radiology equipment vendors/manufacturers
|
|
|
|
|
|
|
|
MP-2 : Radiology Department Master Plan & Renovations - Long Island
Jewish Hospital, Queens, NY
 |
Master
Plan, Addition, and Renovations for 48,000 sf Radiology Department,
including: |
 |
Design
of phased construction plan to allow continued operation of radiology
department |
 |
Design
of patient/staff/material flow
|
 |
Design
of new inpatient and outpatient radiology procedure for the following
modalities : MRI Rooms,, CT Rooms, PetCT Rooms, Nuclear Medicine
Rooms, Angiography/Special Procedures Rooms, X-Ray Rooms,
Radiofluoroscopy (R/F) Rooms, Mammography Rooms, Ultrasound Rooms, and
Bone Densitometry Rooms |
 |
Design
of new PACs reading rooms, reception, waiting room, dressing rooms,
darkrooms, lightrooms, processing areas, hot labs, hot toilets,
regular toilets, clean utility rooms, and soiled utility rooms
|
 |
Project
Budgeting |
 |
Project
Scheduling |
 |
Architectural, Mechanical/Electrical Engineering, Structural
Engineering |
 |
Coordination of acoustic and vibration analysis
|
 |
Coordination of radiation and magnetic shielding
|
 |
Coordination of radiology equipment rigging, including path of entry
and egress of equipment, and required, associated architectural and
structural work |
 |
Coordination with radiology equipment vendors/manufacturers
|
|
|
|
|
|
|
|
MP-3: Radiology Department Master Plan & Renovations - New York
University Hospital Center, New York, NY
 |
Master
Plan, Addition, and Renovations for 45,000 sf Radiology Department,
including: |
 |
Design
of phased construction plan to allow continued operation of radiology
department |
 |
Design
of patient/staff/material flow
|
 |
Design
of new inpatient and outpatient radiology procedure for the following
modalities : MRI Rooms,, CT Rooms, PetCT Rooms, Nuclear Medicine
Rooms, Angiography/Special Procedures Rooms, X-Ray Rooms,
Radiofluoroscopy (R/F) Rooms, Mammography Rooms, Ultrasound Rooms, and
Bone Densitometry Rooms |
 |
Design
of new PACs reading rooms, reception, waiting room, dressing rooms,
darkrooms, lightrooms, processing areas, hot labs, hot toilets,
regular toilets, clean utility rooms, and soiled utility rooms
|
 |
Project
Budgeting |
 |
Project
Scheduling |
 |
Architectural, Mechanical/Electrical Engineering, Structural
Engineering |
 |
Coordination of acoustic and vibration analysis
|
 |
Coordination of radiation and magnetic shielding
|
 |
Coordination of radiology equipment rigging, including path of entry
and egress of equipment, and required, associated architectural and
structural work |
 |
Coordination with radiology equipment vendors/manufacturers
|
|
|
|
|
|
|
|
MP-4: Radiology Master Plan and Renovations - University of
Connecticut, Farmington, CT
 |
Master
Plan, Addition, and Renovations for 25,000 sf Radiology Department,
including: |
 |
Design
of phased construction plan to allow continued operation of radiology
department |
 |
Design
of patient/staff/material flow
|
 |
Design
of new inpatient and outpatient radiology procedure for the following
modalities : MRI Rooms,, CT Rooms, PetCT Rooms, Nuclear Medicine
Rooms, Angiography/Special Procedures Rooms, X-Ray Rooms,
Radiofluoroscopy (R/F) Rooms, Mammography Rooms, Ultrasound Rooms, and
Bone Densitometry Rooms |
 |
Design
of new PACs reading rooms, reception, waiting room, dressing rooms,
darkrooms, lightrooms, processing areas, hot labs, hot toilets,
regular toilets, clean utility rooms, and soiled utility rooms
|
 |
Project
Budgeting |
 |
Project
Scheduling |
 |
Architectural, Mechanical/Electrical Engineering, Structural
Engineering |
 |
Coordination of acoustic and vibration analysis
|
 |
Coordination of radiation and magnetic shielding
|
 |
Coordination of radiology equipment rigging, including path of entry
and egress of equipment, and required, associated architectural and
structural work |
 |
Coordination with radiology equipment vendors/manufacturers
|
|
|
|
|
|
|
|
MP-5: Radiology Master Plan and Renovations - Southampton Hospital,
Southampton, NY
 |
Master
Plan, Addition, and Renovations for 12,000 sf Radiology Department,
including: |
 |
Design
of phased construction plan to allow continued operation of radiology
department |
 |
Design
of patient/staff/material flow
|
 |
Design
of new inpatient and outpatient radiology procedure for the following
modalities : MRI Rooms,, CT Rooms, Nuclear Medicine Rooms, X-Ray
Rooms, Radiofluoroscopy (R/F) Rooms, Mammography Rooms, Ultrasound
Rooms, and Bone Densitometry Rooms
|
 |
Design
of new reception, waiting room, dressing rooms, darkrooms, lightrooms,
processing areas, hot labs, hot toilets, regular toilets, clean
utility rooms, and soiled utility rooms
|
 |
Project
Budgeting |
 |
Project
Scheduling |
 |
Architectural, Mechanical/Electrical Engineering, Structural
Engineering |
 |
Coordination of acoustic and vibration analysis
|
 |
Coordination with radiology equipment vendors/manufacturers
|
|
|
|
|
|
|
|
|
MP-6: Radiology Department - Benedictine Hospital, Kingston, NY
 |
Master
Plan, Addition, and Renovations for 10,000 sf Radiology Department,
including: |
 |
Design
of phased construction plan to allow continued operation of radiology
department |
 |
Design
of patient/staff/material flow
|
 |
Design
of new inpatient and outpatient radiology procedure for the following
modalities : MRI Rooms,, CT Rooms, Nuclear Medicine Rooms, X-Ray
Rooms, Radiofluoroscopy (R/F) Rooms, Mammography Rooms, Ultrasound
Rooms, and Bone Densitometry Rooms
|
 |
Design
of new reception, waiting room, dressing rooms, darkrooms, lightrooms,
processing areas, hot labs, hot toilets, regular toilets, clean
utility rooms, and soiled utility rooms
|
 |
Project
Budgeting |
 |
Project
Scheduling |
 |
Architectural, Mechanical/Electrical Engineering, Structural
Engineering |
 |
Coordination of acoustic and vibration analysis
|
 |
Coordination with radiology equipment vendors/manufacturers
|
|
|
|
|
|
|
|
|
MP-7: Radiology Department - Staten Island University Hospital South,
Staten Island, NY
 |
Master
Plan, Addition, and Renovations for 12,000 sf Radiology Department,
including: |
 |
Design
of phased construction plan to allow continued operation of radiology
department |
 |
Design
of patient/staff/material flow
|
 |
Design
of new inpatient and outpatient radiology procedure for the following
modalities : MRI Rooms,, CT Rooms, Nuclear Medicine Rooms, X-Ray
Rooms, Radiofluoroscopy (R/F) Rooms, Mammography Rooms, Ultrasound
Rooms, and Bone Densitometry Rooms
|
 |
Design
of new reception, waiting room, dressing rooms, darkrooms, lightrooms,
processing areas, hot labs, hot toilets, regular toilets, clean
utility rooms, and soiled utility rooms
|
 |
Project
Budgeting |
 |
Project
Scheduling |
 |
Architectural, Mechanical/Electrical Engineering, Structural
Engineering |
 |
Coordination of acoustic and vibration analysis
|
 |
Coordination with radiology equipment vendors/manufacturers
|
 |
Coordination of radiology suite contractor selection and radiology
suite construction |
 |
Coordination of radiology suite equipment installation
|
 |
Coordination of radiology suite furniture installation
|
|
|
|
|
|
|
|
MP-8: Radiology Master Plan and Renovations Berkshire Medical Center,
Pittsfield, MA
 |
Master
Plan, Addition, and Renovations for 10,000 sf Radiology Department,
including: |
 |
Design
of phased construction plan to allow continued operation of radiology
department |
 |
Design
of patient/staff/material flow
|
 |
Design
of new inpatient and outpatient radiology procedure for the following
modalities : MRI Rooms,, CT Rooms, Nuclear Medicine Rooms, X-Ray
Rooms, Radiofluoroscopy (R/F) Rooms, Mammography Rooms, Ultrasound
Rooms, and Bone Densitometry Rooms
|
 |
Design
of new reception, waiting room, dressing rooms, darkrooms, lightrooms,
processing areas, hot labs, hot toilets, regular toilets, clean
utility rooms, and soiled utility rooms
|
 |
Project
Budgeting |
 |
Project
Scheduling |
 |
Architectural, Mechanical/Electrical Engineering, Structural
Engineering |
 |
Coordination of acoustic and vibration analysis
|
 |
Coordination of radiology suite contractor selection and radiology
suite construction |
 |
Coordination of radiology suite equipment installation
|
 |
Coordination of radiology suite furniture installation
|
|
|
|
|
|
|
|
MP-9: Radiology Master Plan and Renovations - St. Vincent's Catholic
Medical Center, New York, NY
 |
Master Plan, Addition, and Renovations for 20,000 sf Radiology
Department, including: |
 |
Design
of phased construction plan to allow continued operation of radiology
department |
 |
Design
of patient/staff/material flow
|
 |
Design
of new inpatient and outpatient radiology procedure for the following
modalities : MRI Rooms,, CT Rooms, Nuclear Medicine Rooms,
Angiography/Special Procedures Rooms, X-Ray Rooms, Angiography/Special
Procedures Rooms, Radiofluoroscopy (R/F) Rooms, Mammography Rooms,
Ultrasound Rooms, and Bone Densitometry Rooms
|
 |
Design
of new reception, waiting room, dressing rooms, darkrooms, lightrooms,
processing areas, hot labs, hot toilets, regular toilets, clean
utility rooms, and soiled utility rooms
|
 |
Project
Budgeting |
 |
Project
Scheduling |
 |
Architectural, Mechanical/Electrical Engineering, Structural
Engineering |
 |
Coordination of acoustic and vibration analysis
|
 |
Coordination of radiation and magnetic shielding
|
 |
Coordination of radiology equipment rigging, including path of entry
and egress of equipment, and required, associated architectural and
structural work |
 |
Coordination of radiology suite contractor selection and radiology
suite construction |
 |
Coordination of radiology suite equipment installation
|
 |
Coordination of radiology suite furniture installation
|
 |
Coordination of radiology suite contractor selection and radiology
suite construction |
 |
Coordination of radiology suite equipment installation
|
 |
Coordination of radiology suite furniture installation
|
|
|
|
|
|
|
|
MP-10: Inpatient and Outpatient Radiology Department - Hospital for
Joint Diseases, New York, NY
 |
New
department of radiology as part of a new 222,000 sf, 50 bed orthopedic
hospital. The radiological facilities serve both inpatients and
outpatients, including: |
 |
Design
of phased construction plan to allow continued operation of radiology
department |
 |
Design
of patient/staff/material flow
|
 |
Design
of new inpatient and outpatient radiology procedure for the following
modalities : MRI Rooms,, CT Rooms, PetCT Rooms, Nuclear Medicine
Rooms, Angiography/Special Procedures Rooms, X-Ray Rooms,
Radiofluoroscopy (R/F) Rooms, Mammography Rooms, Ultrasound Rooms, ,
Lithroscopy Rooms, Mylography Rooms and Bone Densitometry Rooms
|
 |
Design
of new mobile storage filing room, reception, waiting room, dressing
rooms, darkrooms, lightrooms, processing areas, hot labs, hot toilets,
regular toilets, clean utility rooms, and soiled utility rooms
|
 |
Project
Budgeting |
 |
Project
Scheduling |
 |
Architectural, Mechanical/Electrical Engineering, Structural
Engineering |
 |
Coordination of acoustic and vibration analysis
|
 |
Coordination of radiation and magnetic shielding
|
 |
Coordination of radiology equipment rigging, including path of entry
and egress of equipment, and required, associated architectural and
structural work |
 |
Coordination with radiology equipment vendors/manufacturers
|
 |
Coordination of radiology suite contractor selection and radiology
suite construction |
 |
Coordination of radiology suite equipment installation
|
 |
Coordination of radiology suite furniture installation
|
|
|
|
|
|
|
|
|
MP-11: Inpatient and
Outpatient Radiology - McLaren General Hospital, Flint, Michigan
 |
Extensive renovations and additions to the existing 28,000 sf
department of radiology which was expanded by 50% to 42,000 sf total
department. The radiological facilities serve both inpatients and
outpatients, including: |
 |
Design
of phased construction plan to allow continued operation of radiology
department |
 |
Design
of patient/staff/material flow
|
 |
Design
of new inpatient and outpatient radiology procedure for the following
modalities : MRI Rooms,, CT Rooms, Nuclear Medicine Rooms,
Angiography/Special Procedures Rooms, X-Ray Rooms, Radiofluoroscopy
(R/F) Rooms, Mammography Rooms, Ultrasound Rooms, , Lithroscopy Rooms,
Mylography Rooms and Bone Densitometry Rooms, Stress Testing Rooms,
Echocardiography Rooms, Evoked Response Rooms, EEG Exam Room, and G.I.
Suite. |
 |
Design
of new mobile storage filing room, reception, waiting room, dressing
rooms, darkrooms, lightrooms, processing areas, hot labs, hot toilets,
regular toilets, clean utility rooms, and soiled utility rooms
|
 |
Project
Budgeting |
 |
Project
Scheduling |
 |
Architectural, Mechanical/Electrical Engineering, Structural
Engineering |
 |
Coordination of acoustic and vibration analysis
|
 |
Coordination of radiation and magnetic shielding
|
 |
Coordination of radiology equipment rigging, including path of entry
and egress of equipment, and required, associated architectural and
structural work |
 |
Coordination with radiology equipment vendors/manufacturers
|
|
|
|
|
|
|
|
|
MP-12: Inpatient and
Outpatient Radiology Department - The Valley Hospital, Ridgewood, New
Jersey
 |
New
department of radiology as part of a new 32,000 sf, 320 bed community
hospital. The radiological facilities serve both inpatients and
outpatients, including: |
 |
Design
of phased construction plan to allow continued operation of radiology
department |
 |
Design
of patient/staff/material flow
|
 |
Design
of new inpatient and outpatient radiology procedure for the following
modalities : MRI Rooms,, CT Rooms, Nuclear Medicine Rooms,
Angiography/Special Procedures Rooms, X-Ray Rooms, Radiofluoroscopy
(R/F) Rooms, Mammography Rooms, Ultrasound Rooms, , Lithroscopy Rooms,
Mylography Rooms and Bone Densitometry Rooms, IVP Rooms, Stress
Testing Rooms, EEG Rooms, Sleep Testing Rooms, Evoked Response Rooms,
and EKG Rooms |
 |
Design
of new mobile storage filing room, reception, waiting room, dressing
rooms, darkrooms, lightrooms, processing areas, hot labs, hot toilets,
regular toilets, clean utility rooms, and soiled utility rooms
|
 |
Project
Budgeting |
 |
Project
Scheduling |
 |
Architectural, Mechanical/Electrical Engineering, Structural
Engineering |
 |
Coordination of acoustic and vibration analysis
|
 |
Coordination of radiation and magnetic shielding
|
 |
Coordination of radiology equipment rigging, including path of entry
and egress of equipment, and required, associated architectural and
structural work |
 |
Coordination with radiology equipment vendors/manufacturers
|
 |
Coordination of radiology suite contractor selection and radiology
suite construction |
 |
Coordination of radiology suite equipment installation
|
 |
Coordination of radiology suite furniture installation
|
|
|
|
|
|
|
|
MP-13: Radiology Department -
Interfaith Medical Center, Brooklyn, NY
 |
New
department of radiology as part of a new major upgrade/addition to an
existing community hospital. The radiological facilities serve
outpatients, including: |
 |
Design
of phased construction plan to allow continued operation of radiology
department |
 |
Design
of patient/staff/material flow
|
 |
Design
of new inpatient and outpatient radiology procedure for the following
modalities : MRI Rooms,, CT Rooms, Nuclear Medicine Rooms, X-Ray
Rooms, Radiofluoroscopy (R/F) Rooms, Mammography Rooms, Ultrasound
Rooms, and Bone Densitometry Rooms
|
 |
Design
of new mobile storage filing room, reception, waiting room, dressing
rooms, darkrooms, lightrooms, processing areas, hot labs, hot toilets,
regular toilets, clean utility rooms, and soiled utility rooms
|
 |
Project
Budgeting |
 |
Project
Scheduling |
 |
Architectural, Mechanical/Electrical Engineering, Structural
Engineering |
 |
Coordination of acoustic and vibration analysis
|
 |
Coordination of radiation and magnetic shielding
|
 |
Coordination of radiology equipment rigging, including path of entry
and egress of equipment, and required, associated architectural and
structural work |
 |
Coordination with radiology equipment vendors/manufacturers
|
 |
Coordination of radiology suite contractor selection and radiology
suite construction |
 |
Coordination of radiology suite equipment installation
|
 |
Coordination of radiology suite furniture installation
|
|
|
|
|
 |
|
MP-14: Radiology Department -
Horton Medical Center, Orange County, NY
 |
New
department of radiology as part of a new major upgrade/addition to an
existing community hospital. The radiological facilities serve
outpatients, including: |
 |
Design
of phased construction plan to allow continued operation of radiology
department |
 |
Design
of patient/staff/material flow
|
 |
Design of new inpatient and outpatient
radiology procedure for the following modalities : MRI Rooms,, CT
Rooms, Nuclear Medicine Rooms, X-Ray Rooms, Radiofluoroscopy (R/F)
Rooms, Mammography Rooms, Ultrasound Rooms, Bone Densitometry Rooms,
and Linear Accelerator Suite. |
 |
Design
of new mobile storage filing room, reception, waiting room, dressing
rooms, darkrooms, lightrooms, processing areas, hot labs, hot toilets,
regular toilets, clean utility rooms, and soiled utility rooms
|
 |
Project
Budgeting |
 |
Project
Scheduling |
 |
Architectural, Mechanical/Electrical Engineering, Structural
Engineering |
 |
Coordination of acoustic and vibration analysis
|
 |
Coordination of radiation and magnetic shielding
|
 |
Coordination of radiology equipment rigging, including path of entry
and egress of equipment, and required, associated architectural and
structural work |
 |
Coordination with radiology equipment vendors/manufacturers
|
 |
Coordination of radiology suite contractor selection and radiology
suite construction |
 |
Coordination of radiology suite equipment installation
|
 |
Coordination of radiology suite furniture installation
|
|
|
|
|
|
H-1 Radiology Suite - New York
University Hospital Center, New York, NY
 |
Renovation of 2,500 sf to create a new multi-modality Radiology Suite,
including : |
 |
Design
of phased construction plan to allow continued operation of radiology
department |
 |
Design
of patient/staff/material flow
|
 |
Design
of new radiology equipment rooms for new radiology equipment for the
following modalities including : CT Room, Digital X-Ray Room, and
Ultrasound Room |
 |
Design
of new PACs reading rooms, reception, waiting room, dressing rooms,
lightroom, processing areas, toilets, mechanical room, and electrical
room |
 |
Project
Budgeting |
 |
Project
Scheduling |
 |
Architectural, Mechanical/Electrical Engineering, Structural
Engineering |
 |
Coordination of acoustic and vibration analysis
|
 |
Coordination of radiation and magnetic shielding
|
 |
Coordination of radiology equipment rigging, including path of entry
and egress of equipment, and required, associated architectural and
structural work |
 |
Coordination with radiology equipment vendors/manufacturers
|
 |
Coordination of radiology suite contractor selection and radiology
suite construction |
 |
Coordination of radiology suite equipment installation
|
 |
Coordination of radiology suite furniture installation
|
|
|
|
|
|
|
|
H-2: Research Radiology Center
- NYU School of Medicine, New York, NY
 |
Renovation of 10,000 sf to create a new multi-modality Research
Radiology Suite, including :
|
 |
Design
of patient/staff/material flow
|
 |
Design
of new radiology equipment rooms for new radiology equipment for the
following modalities including : Two 3.0 T./tesla MRI Rooms, 7.0
T./tesla MRI Room, and 64 Slice CT Room. The 7.0 tesla MRI is one of
only a handful of 7.0 tesla MRI's installed worldwide.
|
 |
Design
of new PACs reading rooms, reception, waiting room, dressing rooms,
lightroom, processing areas, toilets, clean utility room, soiled
utility room, exam rooms, administrative wing, research offices, and
conference room |
 |
Project
Budgeting |
 |
Project
Scheduling |
 |
Architectural, Mechanical/Electrical Engineering, Structural
Engineering |
 |
Coordination of acoustic and vibration analysis
|
 |
Coordination of radiation and magnetic shielding
|
 |
Coordination of radiology equipment rigging, including path of entry
and egress of equipment, and required, associated architectural and
structural work |
 |
Coordination with radiology equipment vendors/manufacturers
|
 |
Coordination of radiology suite contractor selection and radiology
suite construction |
 |
Coordination of radiology suite equipment installation
|
 |
Coordination of radiology suite furniture installation
|
|
|
|
|
|
|
|
H-3: Angiography Suite - Bronx
Lebanon Hospital Center, Bronx, NY
 |
Renovation of 2,000 sf to create a new Radiology Suite, including :
|
 |
Design
of phased construction plan to allow continued operation of radiology
department |
 |
Design
of patient/staff/material flow
|
 |
Design
of new radiology equipment rooms for new radiology equipment for the
following modality : Angiography/Special Procedure Room
|
 |
Design
of new Angiography/Special Procedures procedure room,
Angiography/Special Procedures equipment room, Angiography/Special
Procedures control room, holding area, toilet, storage, clean utility
room, and soiled utility room
|
 |
Project
Budgeting |
 |
Project
Scheduling |
 |
Architectural, Mechanical/Electrical Engineering, Structural
Engineering |
 |
Coordination of acoustic and vibration analysis
|
 |
Coordination of radiation and magnetic shielding
|
 |
Coordination of radiology equipment rigging, including path of entry
and egress of equipment, and required, associated architectural and
structural work |
 |
Coordination with radiology equipment vendors/manufacturers
|
 |
Coordination of radiology suite contractor selection and radiology
suite construction |
 |
| | |